Funding rate

  1. The funding rate is a periodic payment between the long side and the short side of a perpetual-futures contract.
  2. On StockTicker24 it is shown in percent per hour (%/hr).
  3. Positive: the long side pays the short side. Negative: the short side pays the long side.

Funding rate: definition, StockTicker24 display rules and dated production-data examples.

Definition

The U.S. Commodity Futures Trading Commission describes the funding rate as a periodic payment between the long and short sides of a perpetual-futures contract. A positive funding rate means the long side pays the short side; a negative rate reverses the direction. The rate is determined by the funding formula, including its interest component and limits, rather than by the sign of the price difference alone.

The protocol documentation ("Funding") sets the payment interval at one hour. The formula is written as an 8-hour rate, and each hour pays one eighth of it. The interest component is 0.01% per 8 hours, which is 0.00125% per hour. The cap is 4% per hour. Payments are peer-to-peer, and no fee is taken from them.

The contract issuer, trade[XYZ], announced on Dec 19, 2025 a multiplier of 0.5 applied to the formula. With that multiplier, the hourly interest component becomes 0.5 × 0.00125% = 0.000625% per hour. StockTicker24 calls this figure the Baseline.

It is not a fee charged by StockTicker24 or by the exchange.

paid every hour; 8 hours is only the basis of the formula.

How it appears on StockTicker24

The rate appears in the Funding rate column of the Market cap tab. The column's description is “Perpetual-futures funding rate per hour”. Lab is hidden during review.

Display rules for the Open interest surface (hidden during review)
Label on screenCalculation
CurrentThe hourly funding rate, in %/hr, at 4 decimal places
BaselineThe instrument's multiplier × the 8-hour interest rate ÷ 8, at the same 4 decimal places
Vs. baselineCurrent as shown − Baseline as shown
7d totalSum of the payments that occurred over the last 7 days, in percent, at 2 decimal places
Per day (×24)Current as shown × 24; simple, with no compounding

The site retrieved its production board snapshot (/api/board-snapshot) at Oct 10, 2026, 05:01:18 UTC (capturedAt 05:01:10.627 UTC). The funding field is an hourly fraction; the table multiplies it by 100.

Cardfunding fieldRate (%/hr)Shown at 4 decimals
S&P 5000.00000625+0.000625+0.0006%/hr
NVIDIA0.00000625+0.000625+0.0006%/hr
USD/JPY0.00.0000000.0000%/hr

For S&P 500 and NVIDIA, the current rate equals the Baseline of 0.000625%/hr. For USD/JPY the site uses an interest rate of 0, so the Baseline is 0. A card shown as 0.0000%/hr has no direction on the surface.

The "Per day (×24)" figure is simple arithmetic on the shown value. For S&P 500: 0.0006 × 24 = 0.0144% per day, with no compounding. This is an hourly-rate extrapolation, not a realized daily total.

read the unit (%/hr) and the sign (who pays) first.

Examples from the current board

Saved observation:

Tables scroll horizontally. Values use each contract’s quoted unit; no currency conversion.

5 highest hourly funding rates
Symbol / contractUnitPrice (mid; mark if missing)prevDayPxDifference vs. prevDayPxChange vs. 24h earlierFunding rate (% per hour)
CXMTxyz:CXMTUSDC6.373756.4218−0.04805−0.748233%+0.043402%
KIOXIAxyz:KIOXIAUSDC80.66779.788+0.879+1.101669%+0.030532%
IRENxyz:IRENUSDC26.324526.925−0.6005−2.230269%+0.030452%
Smartbirdxyz:BIRDUSDC2.3472.37−0.023−0.970464%+0.014%
Rocket Labxyz:RKLBUSDC49.639550.937−1.2975−2.547264%+0.012475%

Price = mid price, or mark price when mid is unavailable. Difference = price − prevDayPx; change vs. 24h earlier = (price ÷ prevDayPx − 1) × 100. Funding rate (%) = hourly decimal × 100. Calculated values are rounded to six decimal places.

Data: our board (perpetual-futures reference values), observed

5 lowest hourly funding rates
Symbol / contractUnitPrice (mid; mark if missing)prevDayPxDifference vs. prevDayPxChange vs. 24h earlierFunding rate (% per hour)
iShares MSCI Taiwan ETFxyz:EWTUSDC103.975106.28−2.305−2.168799%−0.082449%
Teradynepara:TERUSDC318.28325.24−6.96−2.139958%−0.068759%
Applied Optoelectronicspara:AAOIUSDC72.82775.0−2.173−2.897333%−0.060555%
Cipher Digitalpara:CIFRUSDC8.88738.9963−0.109−1.211609%−0.057241%
Broadcompara:AVGOUSDC326.455328.88−2.425−0.737351%−0.056719%

Data: our board (perpetual-futures reference values), observed

Calculation examples

The $10,000 calculation is an independent example in one currency, separate from the yen basis on the board and symbol pages.

Per $10,000 held (example): 7d total as shown × $10,000 ÷ 100.

The following are hypothetical arithmetic examples, separate from the API observations above. "Per day (×24)": 0.0100 × 24 = 0.24%. "Per $10,000 held (example)": 0.35 × 10,000 ÷ 100 = $35. The protocol interest calculation is 0.01% ÷ 8 = 0.00125% per hour; the stated multiplier gives 0.5 × 0.01% ÷ 8 = 0.000625% per hour.

Questions

Is the funding rate a fee charged by StockTicker24?

No. It is a transfer between holders of the two sides of the contract. StockTicker24 only displays the rate and has no trading function.

Does a positive sign mean the price will go up?

No. The sign only states the direction of payment: positive means the long side pays the short side.

Is funding paid every 8 hours?

Under the protocol documentation it is paid every hour. Eight hours is the period the formula is written for.

Related

Sources

The production API examples are a fixed historical snapshot. Building this page does not fetch new prices.

External source titles and URLs were checked on Oct 11, 2026. The historical content retrieval dates are listed below.

  • U.S. Commodity Futures Trading Commission, Policy Statement Concerning the Listing of Perpetual Contracts (adopted May 29, 2026; content retrieved Aug 23, 2026, as cited on the Japanese page).
  • Hyperliquid (protocol documentation), Funding — https://hyperliquid.gitbook.io/hyperliquid-docs/trading/funding (content retrieved Aug 23, 2026, as cited on the Japanese page).
  • trade[XYZ] (contract issuer), Funding Rate Formula Updates — https://docs.trade.xyz/perpetuals/changelog/funding-rate-formula-updates.md (entry dated Dec 19, 2025; content retrieved Aug 23, 2026, as cited on the Japanese page).
  • StockTicker24 production API /api/board-snapshot, retrieved Oct 10, 2026, 05:01:18 UTC.

Glossary: all twelve terms